top of page

Finished my first big install on landsend

Well the job took about 4 1/2 days. I ended up trenching, piping, wiring and nozzling the whole system on my own, but no complaints here.. It was 11 zones right on the water, down on landsend rd. beautiful spot I must say, and it was quite a treat to work on this property. The system is now up and running and watering the plants and grass regularly. Did they ever need it!

Keep checking in to see what else I'll be installing as the summer goes along.


Featured Posts
Recent Posts
Search By Tags
No tags yet.
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic
bottom of page